IMG_0009 (1)

Shop and Lab Spaces

Titan Energy Park has 500 to 500,000 square feet available in several buildings including office, industrial, and manufacturing space in Bellefonte, Pennsylvania.

Titan Energy Park is located in a designated Keystone Opportunity Expansion Zone (KOEZ). The KOEZ designation is effective for the years 2014 through 2023.

Machine and Lab Space Plans

Shop Spaces Plans

Details:

Shop Areas:

Shop 1
Maintenance Repair Offices

Shop 2
The eastern side of Area 3 contains a large app.. 25`x60` CMU & metal siding
building within the flat roof area and not under the 5T crane access, which has
a large roll-up door on the eastern side w/adjacent personnel door, and a
personnel door on the north side.

Shop 3
This room has a small 1/2 T bridge crane located within the building, with a 17`
span, 60` travel and app. 10` lift.

Shop 4
Adjacent to this interior building with a common wall to the south is a smaller
wooden building (20`x25`x8`) with an overhead garage door on the western
wall, and a personnel door & overhead door on the eastern wall.

Lab Space:

Lab 1 – Chemical Lab
This lab was used as a chemical lab.
Lab 2 – Metallurgical lab and offices
The rest of this area has most of the equipment removed except for a tensile
testing machine. The offices still contain furniture and files.

Shop Areas:
MIS area: Maintenance Repair (locker room).
Maintenance Repair Offices (elevated offices): Elevated offices located in
plant 4 with maintenance shop area located under it.
Former Saw Shop: Shop area use by plant maintenance.
• The eastern side of Area #3 contains a large app.. 25’ x 60’ CMU & metal
siding building within the flat roof area and not under the 5T crane access,
which has a large roll-up door on the eastern side w/adjacent personnel door,
and a personnel door on the north side.
o This room has a small ½ T bridge crane located within the building, with a
17’ span, 60’ travel and app. 10’ lift.
• Adjacent to this interior building with a common wall to the south is a smaller
wooden building (20’ x 25’ x 8’) with an overhead garage door on the western
wall, and a personnel door & overhead door on the eastern wall.

Lab Space:
Chemical Lab.
Raw Materials storage area.
Metallurgical lab and offices.
Former Shipping Offices: Located in Plant 4l.
Plant 4 Containment area:
This area was used to store materials for disposal and use.
Along the wall area that is adjacent to the western side of the rail line, is a large
CMU building that served as a locker room/restroom for the previous tenant.
Another smaller CMU building is located adjacent and to the north of this locker
room has a large double personnel door on the northern face and a personnel
door on the eastern wall of this interior building.
Also on the eastern side, is a smaller break-room area with outside ventilation
and AC. Another small CMU storage building is located in the northeast corner
of Area #3. This room has double personnel door access on the west wall of this
room.
– A two-story office in the southwest corner has an independent HVAC system.
– There are two large steel storage tanks (32,000 gal capacity ea).
Also, on the eastern side, there are multiple outside metal-sided storage areas
(not at floor level), along with a newly remodeled office area with second-floor
storage (or office expansion), and an independent HVAC system. Additionally,
there are two CMU multi-use buildings on the eastern wall adjacent to the new
offices.
In the southern portion of Area #5 is a multi-office overhead CMU structure with
an independent HVAC system. Under this structure and at the northern end are
two additional enclosed rooms at floor level

Contact us for more info